Project Overview
Edwards AFB Main Runway
Location: Mojave, CA
Project consisted of the construction of a temporary runway to be used during the removal and replacement of the existing main runway to ensure flight operation continued without interruption. Total removal was 300 feet by 15,000 feet long, resulting in nearly 400,000 cubic yards of demolished concrete.



inspired?
Contact Us About Your Next Project
FILL OUT THE FORM BELOW TO GET IN TOUCH WITH US